Stale air (sometimes called vitiated air) is air that has been affected by human, animal, mechanical or other activities, the effect of which requires that the air is replaced with fresh air to ensure optimal conditions. This might be the result of perspiration, smoking, cooking, use of appliances, musky carpets and fabrics, lack of ventilation and so on.
In their calculations for air extraction, services engineers may consider specific volumes of stale air in m2 to be extracted per hour. They typically work to achieve desirable minimum fresh-air requirements for people and these will vary according to the activities concerned. These ventilation rates or air-change rates determine how many times per hour the stale air in a space should be completely replaced by fresh air.
Approximate air-change rates per hour for various accommodations:
| Accommodation | Air-change rates per hour |
| Factories (large, open) | 1-4 |
| Classrooms and libraries | 2-4 |
| Offices (above ground) | 2-6 |
| Public lavatories | 6-12 |
| Restaurants | 10-15 |
| Kitchens | 20-60 |
Air change rates may need adjustment according to specific conditions that might prevail eg whether smoking will take place or the presence of other fumes. Also, higher levels of relative humidity (ie above 70%) may require higher ventilation rates to reduce the water vapour content in the air.
For more information see: Air change rates.
[edit] Related articles on Designing Buildings
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
ECA's public affairs priorities
Member consultation opens to shape priorities for 2027 to 2030.
Dutyholder responsibilities from 1 July 2026.
Where performance meets practice
The Building Envelope Stage at UKCW Birmingham.
CIAT publishes briefing on planning reforms.
Leaders in Learning for Practice Network
Call for conservation leaders in learning to register interest in new network.
The importance of early engagement
Construction lessons from the Trillium HealthWorks Experience Centre.
Mayors are to be given planning call in powers
Mayors across England will be able to make the most important planning decisions.
The Master Builder: William Butterfield and his times. Book review.
Why construction can't afford to ignore the skills gap.
Building Safety Regulator, 19 August
Gill Kernick appointed Independent Chair of Residents’ Panel.
Connecting knowledge, technology and conservation
Building competence for the future of built heritage.
Building Regulations and Building Safety Act
CIOB publishes free advice for non-domestic clients.